Highlands
take containers to Glenarm
take all extra supplies to Glenarm
install gutters on house - White 5 inch
replace facia bord and install aluminum
clean out fuel tank next to house and fill with clean regular gas - take that and a battery and charger to Douglas garage.
cut off door on 54-foot cellulose trailer
Clean overspray off windows
paint exterior of building
install missing facia on rear of building
install concrete pad for dumpster
paint storage container tan
As of 1-12-2026
Cut fence at sugarloaf
Do touch up paint
Install new front door
As of 1-12-2026
Crane out boom lift
dig up drain again and fix from lift
Clean out garage
Take safe door to basement
Take down scaffolding on right side
Call in inspections
Remove plastic on exterior of windows
Install mirror in powder room
Fix fart fan in upstairs bathroom
Install panel on island
Install trim piece on stove vent
Install stove vent
Install floor vent in living room under cabinets
Install 2 screws on vent on jacuzzi
Reorder mirrors in master bath
Sand floors in storage area
Install screen doors
Install plates for lights on front porch
Verify all vent covers are installed
and thermostats are installed
Electrical
Install exterior front light by door
Install lights above mirrors in bathrooms
Install lights in garage storage room
Install 2 can lights in ceiling above garage door
take all siding to Glenarm
Spring
Apply sealant to concrete porch front and back
bill out for eric and for gutter guards
As of 1-12-2026
Paint interior walls
remove cove base
install cabinets
clean out sound room
As of 1-12-2026
Cut in drainage tiles
grade rear lot
move duxxback deck
As of 1-12-2026
Install steel roof rear of home
paint ceiling and walls
As of 1-12-2026
order 4 planks of wood for deck
fill holes and paint trim
As of 1-12-2026
pick up branches from storm
clean out crawl space from remodel unit 6
do punch list for homeowner
install cedar beams
As of 1-12-2026
build fence
complete electric
have drywall delivered
deliver shed
paint offices
pour concrete around light pole
install American flag on pole
move dumpster to front parking space at station
take 2 lawn mowers from dans house to get repaired at hanks - heather has info
take service line to Rochester station from harbor point
take tanning bed from gooseneck trailer to Mullins
take plows and yellow trucks at Glenarm to Mullins dump
re-deck yellow trailer
put new batteries on semi-truck
install solar battery charger on telehandler
house code 44507
clean - take pics put up for sale
new bobcat equipment at dans house needs assembled.
install new deck
take trailer to auburn for sandblast and powder coat
complete
complete
complete
install electric
build shelves
* hook up new power main.
run electric to power main.
* run power to outside ac units.
* fix ceiling fart fan in unit 6
main entry door needs repaired.
check exit signs for batteries.
bed 7 and 8 music don't work
trim needs installed at front desk.
bathroom door needs wood filler.
remodel unit
fix exterior lights.
clean exterior windows
pour concrete for dumpster.
finish painting all the parking lot lines.
install signs to exterior of the building.
install missing fascia at west side of building.
gutters need cleaned.
power wash building.
touch up exterior paint.
install new man doors on pole barn.
take bobcat out and brush hog tall weeds in rear.
back porch needs power washed
Grease all fittings.
pressure wash unit and clean interior.
Grease all fittings.
pressure wash unit and clean interior.
pressure wash unit and clean interior.
install battery shut off - in dan office
Grease all fittings.
take to harbor point