Priority items will have a * next to them.
1. Keep in mind that our priority #1 is keeping all the
sub-contractors going with materials.
2. Rental property up-keep and cleaning move out units up for the next tenants.
3. Keeping the business rentals happy. filters on hvac, trash light bulbs
4. Lawn Maintenance
Install door knob on utility room in garage
install stove vent cover.
install vent in ceiling in laundry room
fix hole in ceiling of utility room
clean and seal garage floor concrete
clean and install screens
clean and mop hvac room
apply 2nd coat clear coat to garage floor
install blinds in kitchen
completely clean house
move cars
hook up gutter drains
install door handle to basement door
BSMT clean out the window wells
BSMT clean the window well itself
install cap on drain in window well
clean out rear drain ditch
weed and weed kill the area at the drain ditch
clean screens and install screens
install over cut rings to lights on back porch
install ring door bell
install ring doorbell
take fireplace in basement to cardinal hill
fix windows
install fence gate
install lock on shed door
build shelves
take over lawn mower
install wiring
Foam rest of house
do punch list for homeowner
install cedar beams
Install sod
complete deck wire
install thin black trim to soffit and paint
Pressure wash both units exterior siding
clean gutters
pick up remaining dumpsters
move dumpster to front parking space at station
take 2 lawn mowers from dans house to get repaired at hanks - heather has info
take service line to Rochester station from harbor point
take tanning bed from gooseneck trailer to Mullins
puck up large scissor lift from McWhorter
take plows at Glenarm to Mullins dump
re-deck yellow trailer
put new batteries on semi-truck
install solar battery charger on telehandler
complete backfill as much as possible
house code 44507
clean - take pics put up for sale
new bobcat equipment at dans house needs assembled.
install new deck
take trailer to auburn for sandblast and powder coat
complete
complete
complete
install electric
build shelves
install lock on shed door
takeover lawn mower
* hook up new power main.
run electric to power main.
* run power to outside ac units.
* fix ceiling fart fan in unit 6
main entry door needs repaired.
check exit signs for batteries.
bed 7 and 8 music don't work
trim needs installed at front desk.
bathroom door needs wood filler.
Frame and finish the 2nd portion of dr office lower level.
sperate new hair salon and install new subfloor.
install new can lights.
install new can lights.
fix exterior lights.
clean exterior windows
remove tree for new dumpster.
pour concrete for dumpster.
finish painting all the parking lot lines.
install signs to exterior of the building.
remove the tv tower at west of building.
install missing fascia at west side of building.
demo lower-level bathrooms and remodel.
gutters need cleaned.
power wash building.
touch up exterior paint.
fix vent fans on roof.
install new man doors on pole barn.
take bobcat out and brush hog tall weeds in rear.
back porch needs power washed
Grease all fittings.
pressure wash unit and clean interior.
Grease all fittings.
pressure wash unit and clean interior.
pressure wash unit and clean interior.
install battery shut off - in dan office
Grease all fittings.
take to harbor point